Construction Finance for First Buyers: 2026 Guide

Table of Contents

Last Updated: September 14, 2026

How Construction Finance Works for First Buyers

Construction finance is a home loan for building a new home, where funds are released in stages as the build progresses rather than as a lump sum. At FinanceCorp, we’ve spent more than 26 years helping Australians navigate this process, and it remains one of the most misunderstood areas of lending for first-time buyers.

The core difference from a standard mortgage: with an established home, the lender hands over the full amount at settlement. With a construction loan, funds are released in progress payments, or drawdowns, as each stage is completed and verified.

That structure protects both you and the lender: you’re not paying interest on money not yet spent, and the lender isn’t exposed to a half-finished house.

Most major lenders offer construction finance, but the fine print varies enormously. Some cap the number of drawdowns, some charge valuation fees at each stage, and some are far stricter about contract wording. According to Moneysmart’s guide to home loans, borrowers should compare the total cost of a loan, not just the interest rate, because fees on construction products can add up quickly.

Interest-Only Repayments During the Build

During construction, you typically make interest-only repayments on the amount drawn down so far. If your loan is $600,000 and the slab stage has drawn $120,000, you only pay interest on that $120,000.

This is one of the few genuine advantages of construction finance: repayments start low and rise gradually, easing your budget while you may also be paying rent.

Once the home reaches practical completion and you move in, the loan usually converts to principal and interest repayments on the full balance.

Interest-Only vs Principal and Interest

The interest-only phase is not permanent, and treating it as such is a common mistake. Lenders typically allow it only for the build, usually 6 to 12 months.

After that, you move to principal and interest and repayments jump, sometimes significantly. Work out that post-construction figure before you sign, because a repayment you can afford during the build may stretch you once the full loan is drawn.

Watch Out
Some first buyers budget only for the interest-only repayments and get a shock when the loan converts. Calculate your principal and interest repayment from day one and confirm you can cover it. Lenders assess your serviceability on that higher figure anyway.

Construction Loan Progress Payments Explained

Progress payments are scheduled releases of loan funds, triggered when each stage is completed and inspected, keeping your builder paid without handing over the entire loan upfront.

The stages are set out in your fixed-price building contract, and the lender releases funds only on evidence the stage is finished: usually a builder’s invoice, a progress inspection report, and sometimes a statutory declaration.

What most guides skip: the lender’s valuer, not your builder, determines how much each stage is worth. If your builder invoices $80,000 for the frame stage but the valuer assesses $70,000, you may need to cover the gap unless your contract aligns with the lender’s schedule.

A young couple sitting at a kitchen table with a laptop, reviewing a construction loan progress payment schedule and building plans, with a coffee mug and notepad nearby
A young couple sitting at a kitchen table with a laptop, reviewing a construction loan progress payment schedule and building plans, with a coffee mug and notepad nearby

The Five Building Stages and What Triggers Each Drawdown

The standard drawdown schedule follows five stages. Your contract may name them differently, but the sequence is consistent.

StageWhat’s CompletedTypical Drawdown
Deposit / baseLand settled, site prepared, slab pouredInitial payment
FrameWall and roof framing erectedSecond payment
Lock-upRoof, windows, external doors installedThird payment
FixingInternal linings, cabinetry, fixtures fittedFourth payment
Practical completionFinal finishes, occupancy certificate issuedFinal payment

Each drawdown requires a progress inspection before funds are released, so budget for a lag of one to two weeks at each stage.

Pro Tip
Ask your builder to align their invoice schedule with your lender’s drawdown schedule before the contract is signed. Misaligned schedules are the single most common cause of cash-flow stress during a build.

Deposit Requirements, LVR and Lenders Mortgage Insurance

Your loan-to-value ratio, or LVR, is the loan amount divided by the property’s value, and it drives almost everything else in your application. Most lenders want an LVR of 80% or lower to avoid lenders mortgage insurance, or LMI (moneysmart.gov.au).

For a construction loan, the lender uses an as-if-complete valuation: what the finished home will be worth, not the vacant land’s value today. This usually supports a higher valuation, and therefore a lower LVR, than raw land value alone.

Deposits for a land and build package typically sit between 10% and 20% of total project cost, though some lenders accept less with LMI. You’ll also need genuine savings and a contingency fund, usually 5% of the build cost, for variations and unexpected costs.

How LMI Is Calculated on a Construction Loan

LMI is a one-off premium that protects the lender, not you, if you default. It is charged when your LVR exceeds the lender’s threshold, usually 80%, and rises sharply as LVR climbs.

On a construction loan, it is calculated on the as-if-complete value and the total loan amount, including land and build contract. A higher valuation pulls your LVR down and can push you under the 80% threshold entirely.

LMI can usually be capitalised onto the loan rather than paid upfront, which helps cash flow but increases what you owe and the interest over the loan’s life. Ask your lender to quote both options.

The Land and Build Split

A land and build package is often two separate contracts: one for the land, one for the construction. Lenders handle this differently, and the structure affects your deposit.

Some lenders treat it as a single loan with a single deposit, which is simpler. Others require you to settle the land first with a separate loan, then take out a construction loan for the build, which may mean two deposits and LMI on the land loan before the construction loan is drawn.

Pro Tip
Ask your lender upfront whether they will fund the land and the build under one facility or two. A single facility usually means one deposit, one set of fees and one LMI premium, which can save you thousands.

Genuine Savings and Contingency

Lenders want genuine savings: money accumulated over time rather than a recent lump sum. A common benchmark is 5% of the purchase price held for at least three months, though policies vary. (Source: Australian Bureau of Statistics data on new dwelling commencements)

On top of your deposit, hold a contingency fund of around 5% of the build cost. It is not your deposit and should not top it up. Variations, unbudgeted site costs and delays all draw on contingency, and a build without one stalls.

Key Takeaway
The as-if-complete valuation is your friend. It values the finished home, not the empty block, which can push your LVR below the LMI threshold and save you thousands. But it only helps if your build contract and land value are assessed together, so confirm the structure before you apply.

First Home Buyer Grants in Australia 2026

Government support for first home buyers is administered at state and territory level, so the amount, price cap and eligibility rules depend on where you’re building. That’s the biggest reason generic national figures mislead.

The First Home Owner Grant, or FHOG, is the headline scheme. It is paid by the state or territory revenue office, not the federal government, and is generally reserved for new builds or substantially renovated homes. That makes it directly relevant to a construction loan, because a house you build from scratch almost always qualifies where an established purchase would not.

Enquire Today →

Beyond the FHOG, most jurisdictions offer some combination of:

  • A stamp duty concession or full exemption for first home buyers, often with a price threshold above which the concession tapers.
  • A first home buyer assistance scheme that reduces or defers duty on new homes.
  • Additional concessions for new builds specifically, which can stack with the FHOG.
  • A shared equity or low-deposit scheme in some states, where the government takes an equity stake to reduce your loan amount.

The federal First Home Guarantee is separate. It lets eligible first buyers purchase with as little as a 5% deposit without paying lenders mortgage insurance, because the government guarantees part of the loan. Places are capped and released in rounds, so timing matters.

Do not build grant amounts into your budget until your eligibility is confirmed in writing. Thresholds are indexed and change at each state budget, and a grant you counted on can disappear if your contract price creeps over the cap.
::: Maintaining a strict buffer against these price fluctuations remains the most effective strategy for avoiding budget overruns while securing your project’s financial stability.

How to Check What Applies to You

Work through this in order, because the schemes interact:

  1. Confirm your state or territory, since that determines every threshold.
  2. Check the FHOG eligibility rules for new builds, including the price cap and whether you must live in the home for a minimum period.
  3. Check the stamp duty concession separately, it is a different scheme with a different cap.
  4. Check whether the federal First Home Guarantee has places available in the current round.
  5. Ask your lender or broker to confirm which schemes they can process at settlement, because not all lenders handle every grant.

Because these schemes are updated frequently and the thresholds are set by each state and territory, check the official first home buyer guidance and your state revenue office for current figures before you build them into your budget. A broker can tell you which grants apply to your situation, but the eligibility rules come from the government, not the lender.

The Timing Trap Most First Buyers Fall Into

The FHOG is typically paid at settlement or shortly after, not upfront. On a construction loan, it does not arrive in time to fund your deposit or first progress payment, so you still need genuine savings and a contingency fund to carry the build until it lands.

A common pattern is a first buyer counting the grant as part of their deposit, only to find the lender assesses serviceability and genuine savings without it. Treat the grant as a bonus after settlement, not capital you rely on during the build.

Building Contract Requirements for Lenders

Lenders will not approve construction finance without a fixed-price building contract that meets their requirements.

A fixed-price contract locks in the total build cost, protecting the lender from cost overruns and you from a builder who wants to renegotiate mid-project. It must include a detailed scope of works, a progress payment schedule, a completion date, and evidence of the builder’s registration and insurance.

What most first buyers miss is the variations clause. Changing your mind about tiles or cabinetry after signing is a variation, and it usually comes out of your pocket, not the loan. Keep your contingency fund separate from your deposit.

Never sign a building contract before your lender has reviewed it. Contracts that don’t match the lender’s drawdown schedule, or that lack a fixed price, are a common reason construction loans get declined late in the process.

Builder Insolvency and Risk Mitigation

Builder insolvency is the risk nobody wants to talk about, and it can turn a dream build into a financial nightmare. When a builder collapses mid-project, you’re left with a half-finished home, a loan you’re still paying interest on, and no clear path forward.

Most states offer home warranty insurance and, where the builder is registered, access to a compensation scheme. These are not automatic, and coverage limits and claim processes vary by jurisdiction, so verify what applies in your state before you sign.

Practical steps reduce your exposure. Check the builder’s registration and insurance directly with the state authority rather than relying on a certificate they hand you, and ask about their financial standing and how long they’ve operated. Never pay outside the contract schedule, and never pay a builder directly for work the lender hasn’t inspected.

A common mistake is choosing a builder purely on price. The cheapest quote often has the thinnest margins and least capacity to absorb a cost increase. Paying slightly more for a builder with a long track record is money well spent.

Post-Construction Refinancing and the Switch to a Standard Loan

When the build is finished and the occupancy certificate is issued, your construction loan converts to a standard home loan. That’s when most people stop paying attention, and exactly when you should start.

Construction loans often carry higher rates and fees than standard loans, because the lender takes on more administration and risk. Once the home is complete and you have a certificate of occupancy, you’re in a much stronger position to refinance.

Refinancing after construction lets you move to a lower rate, switch to principal and interest on better terms, or access equity if the as-if-complete valuation came in higher than expected. Many borrowers find their LVR improves once the finished home is valued, which can eliminate LMI on the refinance.

At FinanceCorp, we compare options from a panel of over 25 lenders and hundreds of loan products, and we stay with clients through the post-construction transition. If your current lender won’t sharpen their rate, we can check whether another will.


Building your first home is a long process, and construction finance is where the paperwork gets serious. The right loan structure, a contract that matches your lender’s schedule, and a realistic contingency fund make the difference between a smooth build and a stressful one. FinanceCorp has helped Australians through construction finance for more than 26 years, comparing options across a panel of over 25 lenders and hundreds of loan products to find the most appropriate fit for your situation. Whether you’re weighing a land and build package, choosing between interest-only and principal and interest, or planning the refinance once you’ve moved in, our team can simplify the borrowing process and guide you through each step. Enquire today to get started.

Frequently Asked Questions

How much deposit do you need for a construction loan?

Most lenders look for a 20% deposit, which is calculated on the land price plus the fixed-price building contract. With a smaller deposit, you may still qualify, but lenders mortgage insurance (LMI) usually applies. Some lenders accept a 10% deposit for construction finance, and first home buyers using a government guarantee scheme may qualify with as little as 5%. Your borrowing capacity and credit score also affect what a lender will approve.

How does a construction loan differ from a standard home loan?

A standard home loan pays the seller in one lump sum at settlement. Construction finance releases funds in stages as the build progresses, called progress payments or drawdowns. You only pay interest on the amount drawn during construction, which keeps repayments lower while the home is being built. Once the occupancy certificate is issued and the build is complete, the loan typically converts to principal and interest repayments.

How do progress payments work during the building process?

Progress payments are released at set building stages, usually slab, frame, lock-up, fixing and practical completion. After each stage, your builder sends an invoice and a licensed inspector or valuer confirms the work is done before the lender releases the next drawdown. Keeping a contingency fund for variations and any stage delays is important, because lenders will not release funds for work that has not been completed and inspected.

Are first home buyer grants available for new construction?

Several first home buyer grants and concessions apply to new builds, including the First Home Owner Grant (FHOG) in most states and territories, and stamp duty exemptions or concessions on new homes below certain price thresholds. Rules, amounts and eligibility criteria vary by state and change over time. Check the official revenue office in your state or territory for current figures before you rely on any grant in your budget.

What documents do lenders require for a construction loan application?

Lenders typically ask for a fixed-price building contract, approved council plans, a builder’s registration and insurance certificates, a progress payment schedule, proof of income and savings, and identification. They also want a valuation of the land and an as-if-complete valuation of the finished home. Having these ready before you apply can speed up pre-approval and reduce the risk of delays during the build.

How long does construction loan approval take?

Pre-approval usually takes a few days once your documents are complete. Full approval depends on the valuation, the building contract review and the lender’s assessment of your borrowing capacity. A mortgage broker can help you prepare documents upfront and compare options from a panel of lenders, which often shortens the process. Timelines vary by lender and by how quickly your builder supplies the required paperwork.